Replacement of High-Pressure Natural Gas Piping To Three Co-generation (Cogen) Units
Working both inside and out - supplying manpower, tools, equipment and material to our highly-valued customer, in order to replace this critical high-pressure natural gas line at a large edible food manufacturing plant in South-Western Ontario, Canada, our AIM Industrial Pipe-fitters replaced two gas mains from the outside metered gas train to the 3 co-generation units. Piping was 3” and 4” schedule 40 A106B seamless carbon steel with 300lb. and 150lb. flanges.